• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • Panel Report: 37 Miners Died of Suffocation in NSCDC Custody; Recommends N1.4bn Compensation
  • Sad! 5 Siblings of Gombe Gov Die in Auto-crash on Way to School; Yahya Mourns
  • WEMPCO Directors Face Jail Term as UBA Seeks to Recover N61bn Loan
  • 2027: How APC Became the Galacticos of Nigeria’s Politics
  • NEDC Yet To Finalise Distribution Plan For 10,330 Electric Vehicles – Bauchi Coordinator
  • APC PCC Mocks ADC for Owing Staff 12-month Salaries; ‘Is This How You’re Going to Treat Nigerian Workers’
  • Nigeria Has Best Team in Health Sector – First Lady
  • First Lady Commissions PBAT Door-to-door Campaign H’Quarters
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » OSSAP-SDGs Denies Paying N141.1m To Restaurant, Insists Projects Were Duly Executed By Certified Contractor
News

OSSAP-SDGs Denies Paying N141.1m To Restaurant, Insists Projects Were Duly Executed By Certified Contractor

Khadijah OlowodeBy Khadijah OlowodeNovember 9, 2023No Comments21 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Office of the Senior Special Assistant to the President on Sustainable Development Goals (OSSAP-SDGs) has denied the report that it paid the sum of N141.1 million to an Abuja based restaurant two weeks before the expiration of the Buhari administration. 

The Office described the report by an online media as not only misleading but false and a calculated attempt to smear the good image of the Office. 

A statement issued by the Head of Communications in OSSAP-SDGs, Rotimi Ajayi stated that the office wouldn’t have dignified the piece with a reply, but for the innocent readers who might not actually understand the crux of the matter, there is a need to set the records straight.

“This is to state clearly that the reports carried a distorted account of the procedure and shows the ignorance of the writer on how things operate in government institutions.

“We wish to state categorically that the information contained in the said publication are inaccurate and very likely a deliberate attempt to misrepresent the issues with the intent to embarrass the Office of the Senior Special Assistant to the President on SDGs, as there was no issue of fraud or abuse of process in the execution of the said project.”

“OSSAP-SDGs categorically refutes the allegations and insists that it has been transparent in the construction of the skills acquisition centres and blocks of classrooms in Lagos State, as well as many similar projects across the country,” the statement said.

The statement noted that according to records provided by the company during the bid process, the company in question is duly registered with valid incorporation and tax documents with the Corporate Affairs Commission, CAC.

The allegation of it being a mere restaurant is equally from the figment of the imagination of the author, as the project was executed by a team of professionals with the necessary qualifications and expertise in construction and engineering. The structures were built in accordance with specifications and industry standards, as confirmed by photographic evidence with GPS coordinates provided.

The Office noted that the decision to relocate the project from its original site in Ajeromi was necessitated by the insufficient space at the original location, to ensure the successful completion of the project.

Contrary to the claims in the report, the project was executed as specified, and the block of classrooms and skills acquisition centre were completed and commissioned for use. 

Photographic evidence with GPS coordinates are available to substantiate this fact.

“In conclusion, we assert that the report is marred by inaccuracies, as

the award of the contract followed due process and was not arbitrary,” the statement said.

Administration construction Development transparent
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Khadijah Olowode

    Related Posts

    Panel Report: 37 Miners Died of Suffocation in NSCDC Custody; Recommends N1.4bn Compensation

    October 27, 2026

    Sad! 5 Siblings of Gombe Gov Die in Auto-crash on Way to School; Yahya Mourns

    October 27, 2026

    WEMPCO Directors Face Jail Term as UBA Seeks to Recover N61bn Loan

    October 27, 2026

    Panel Report: 37 Miners Died of Suffocation in NSCDC Custody; Recommends N1.4bn Compensation

    October 27, 2026

    Sad! 5 Siblings of Gombe Gov Die in Auto-crash on Way to School; Yahya Mourns

    October 27, 2026

    WEMPCO Directors Face Jail Term as UBA Seeks to Recover N61bn Loan

    October 27, 2026

    2027: How APC Became the Galacticos of Nigeria’s Politics

    October 27, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.