• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • Customs Intercepts Smuggled Goods Worth ₦721.9m in Sokoto, Zamfara
  • Senators Back Akpabio for Second Term
  • APC PCC Visits Olubadan
  • Tinubu Transmits 3 Executive Bills to Overhaul NDLEA, NSIB, Replaces ASCON
  • Canadian Police Arrest Nigerian Man Over Alleged Sexual Assault
  • FG Clears Air on Electricity Tariff hike
  • ToluwaniSings: After He Slumped, We Took Him to 8 Hospitals But None Admitted Him – Aide
  • Nigeria’s Inflation Rate Drops to 14.64% in September
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Succour for Motorists as Reconstruction Work Begins on Lagos-Ota-Abeokuta Expressway
featured

Succour for Motorists as Reconstruction Work Begins on Lagos-Ota-Abeokuta Expressway

Abimbola OgunaikeBy Abimbola OgunaikeAugust 21, 2024No Comments22 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Succour is on the way for motorists plying the Lagos-Ota-Abeokuta Expressway as the contracting firm, Craneburg, has moved to the site to begin the reconstruction of the ever-busy road.

The flag-off/turning of the sod for the reconstruction will take place on Friday, 23 August, 2024. It will be performed by the Governor of Ogun State, Prince Dapo Abiodun.

Craneburg started mobilizing its equipment to the site 10 days ago to begin palliative measures in an attempt to make one side of the road motorable, while construction proper begins on the other section.

The palliative measures already completed on the road covered Sango-Ota, Pakoto, Ifo, Ewekoro, Itori, and Obada, with stone bases spread on the bad portions to make traveling less stressful while the reconstruction is ongoing.

The Federal Government-owned road has been in a deplorable state for more than 20 years. It was finally handed over to the state government this year by the President Bola Ahmed Tinubu-led administration after previous efforts.

Governor Abiodun emphasized that bureaucratic bottlenecks stalled the reconstruction of the road.

While recalling the efforts by the Ogun and Lagos state governments to take over and reconstruct the expressway, Abiodun said he and his Lagos State counterpart were frustrated by delays from the federal government.

According to the Governor, with President Bola Ahmed Tinubu, the federal government was approached again for the transfer of the road to the state, a request that was granted.

He said: “The Abeokuta-Ota-Lagos road is a federal government road and has been in very bad shape for long. Because of the suffering our people endure on the road, my counterpart in Lagos and I jointly wrote a letter using a single letterhead to the federal executive council, seeking the transfer of that road for us to reconstruct.

“After waiting for a month without a reply, we wrote a reminder. That road was not handed over to us until the present federal government came on board.

“The contract for the road had been awarded since May this year.”

Craneburg Lagos-Ota-Abeokuta Expressway Ogun State Road Construction Tinubu
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Abimbola Ogunaike

    Related Posts

    Customs Intercepts Smuggled Goods Worth ₦721.9m in Sokoto, Zamfara

    October 15, 2026

    Senators Back Akpabio for Second Term

    October 15, 2026

    APC PCC Visits Olubadan

    October 15, 2026

    Customs Intercepts Smuggled Goods Worth ₦721.9m in Sokoto, Zamfara

    October 15, 2026

    Senators Back Akpabio for Second Term

    October 15, 2026

    APC PCC Visits Olubadan

    October 15, 2026

    Tinubu Transmits 3 Executive Bills to Overhaul NDLEA, NSIB, Replaces ASCON

    October 15, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.