• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • Police Arrest 7 Suspects over Murder of BEDC Staff 
  • Disu Commissions New SPU Base 1 in Kano, Appreciates Donor’s Big Heart 
  • ‎WPRF 2026: Delegates Arrive Nigeria in Fear, Leaving Deeply Impressed – CGC Adeniyi
  • Measuring & Improving Learning Outcomes Across Africa: Gradely Technologies Partners with Japan’s SPRIX Inc.
  • 2027: Tinubu, Atiku, Obi, 3 Others for January 10  Presidential Debate by Political Intelligence Group
  • Pay Your Lawyers, COWAJ Urges ADC Leadership as Party Owes Legal Fees for Over 200 Cases
  • APC National Secretary Mobilises Coordinators, Team Leaders in Osogbo Ahead 2027 General Elections
  • Ojajuni Visits Odegbami, Assures on Investigation into Attack, Vows to Apprehend Perpetrators
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Abuja-Kaduna Rail Disruptions Temporary, Not Neglect, NRC Tells Passengers; Read Full Statement Here
News

Abuja-Kaduna Rail Disruptions Temporary, Not Neglect, NRC Tells Passengers; Read Full Statement Here

Olamide ObayemiBy Olamide ObayemiDecember 9, 2025Updated:December 9, 2025No Comments43 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Nigerian Railway Corporation has received and carefully reviewed the article written by veteran journalist Muhammad Iskeel Abdullahi, published on the platform Journalists for Development, regarding the state of the Abuja-Kaduna Train Service.

We appreciate the passion, concern and sense of national responsibility expressed. These are genuine sentiments shared by a concerned customer and a patriotic Nigerian. We value all our customers and take every feedback seriously.

As rightly noted, the Abuja–Kaduna corridor is a flagship service of the nation’s modern railway revival. It is therefore understandable that any disruption, no matter how minimal, is widely felt. We acknowledge the discomfort experienced by our numerous commuters who have had to bear the reduction in services caused by the August 26 incident, which damaged our flagship Diesel Multiple Unit rolling stock. We regret the inconveniences this has caused.

It is important to clarify that the reduction in service frequency is not the result of neglect or indifference, but the direct outcome of two major setbacks.

The first is the March 2022 terrorist attack, which led to the loss of precious lives and caused severe trauma. In response, the Corporation prioritised safety, redesigned operating procedures, restricted late trips and strengthened security collaborations with the Armed Forces and the Police to prevent a recurrence.

The second is the recent derailment incident, which damaged several coaches and reduced the number of serviceable rolling stock available for daily operations. Repairs and refurbishment are ongoing with urgency, alongside arrangements for the deployment of additional coaches to restore normal frequency as soon as possible.

We reassure our esteemed passengers that these challenges do not represent a decline in our commitment. They reflect a phase of recovery, restoration and rebuilding. The Federal Government, under the Renewed Hope Agenda of President Bola Ahmed Tinubu, has demonstrated strong support for strengthening rail infrastructure nationwide, and the Honourable Minister of Transport is consistently engaged with the Corporation to fast-track full restoration.

Ongoing Interventions

Damaged coaches are currently undergoing repairs and certification for safe return to service.

Alternative rolling stock is being considered for temporary reinforcement where technically feasible.

Security enhancement across the corridor continues to receive top priority.

The full restoration of multiple daily trips remains a foremost operational target.

We respectfully appeal for continued understanding and patience as we work tirelessly to return the Abuja–Kaduna Train Service to its full schedule. We are confident that passengers will witness progressive improvement and, ultimately, the complete normalisation of services as the restoration process advances.

The Abuja–Kaduna Train Service remains our pride. We value every voice, including that of Mr. Iskeel and all passengers who rely on our services daily. Your concerns strengthen our resolve.

We remain committed to safety, reliability and service excellence. Our doors are open, and we will continue to communicate developments transparently. The Managing Director can be reached via SMS on 08075005411.

Signed:
Callistus Unyimadu
Chief Public Relations Officer
Nigerian Railway Corporation

Abuja-Kaduna train service Nigerian Railway Corporation (NRC)
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Olamide Obayemi

    Related Posts

    Police Arrest 7 Suspects over Murder of BEDC Staff 

    November 21, 2026

    Disu Commissions New SPU Base 1 in Kano, Appreciates Donor’s Big Heart 

    November 21, 2026

    ‎WPRF 2026: Delegates Arrive Nigeria in Fear, Leaving Deeply Impressed – CGC Adeniyi

    November 21, 2026

    Police Arrest 7 Suspects over Murder of BEDC Staff 

    November 21, 2026

    Disu Commissions New SPU Base 1 in Kano, Appreciates Donor’s Big Heart 

    November 21, 2026

    ‎WPRF 2026: Delegates Arrive Nigeria in Fear, Leaving Deeply Impressed – CGC Adeniyi

    November 21, 2026

    Measuring & Improving Learning Outcomes Across Africa: Gradely Technologies Partners with Japan’s SPRIX Inc.

    November 21, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.