• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • Orile-Agege PBAT/KOH CC, City Boy Movement Flags-off Campaign with Free Medical Outreach
  • Heritage Energy Relocates Over 100 Uzere residents As Multi-agency Investigation Continues
  • LIRS Reaffirms Commitment to Staff Welfare, Professional Development
  • AFRIMA Founder Mike Dada Joins ACG Advisory Board
  • Eleganza Plans to Revive Manufacturing Operations at Alaba- Suru
  • NDLEA Arrests Ugandan Woman with Cocaine Concealed in Private Parts; Uncovers Multi-billion-Naira Drug Cartels
  • Nigeria Reaffirms Commitment to ECOWAS Migration, Border Security Cooperation 
  • Atiku: Fayose Moment has Arrived for CJN Kekere-Ekun
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Lagos Govt Announces Partial Closure Lagos-Abeokuta Expressway for 28 Days
featured

Lagos Govt Announces Partial Closure Lagos-Abeokuta Expressway for 28 Days

Lagos State Government, Partial Closure Lagos-Abeokuta Expressway for 28 Days, Oluwaseun Osiyemi,
Abimbola OgunaikeBy Abimbola OgunaikeFebruary 10, 2026Updated:February 10, 2026No Comments13 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Lagos State Government on Tuesday, 10 February, 2026 announced a partial closure of the Lagos–Abeokuta Expressway to allow the Federal Ministry of Works to carry out critical rehabilitation on failed portions of the road, reports thegazellenews.com.

The state Commissioner for Transportation, Oluwaseun Osiyemi, who made this disclosure through a statement issued on Tuesday, 10 February, 2026, said the rehabilitation would cover the stretch from U-Turn Bus Stop to Sango Tollgate, affecting both inbound and outbound lanes.

Osiyemi stated that the repair works are scheduled to commence on Wednesday, 11 February, 2026, and conclude on Wednesday, 11 March, 2026, spanning a period of four weeks.

While explaining that the project would be implemented in two phases to minimise traffic disruption along the busy corridor, Osiyemi disclosed that Phase One, which will focus on Abeokuta-bound traffic from U-Turn Bus Stop inward Sango Tollgate, will run from February 11 to March 4, 2026.

Osiyemi noted that during this phase, traffic from Lagos and Abule-Egba towards Abeokuta and Sango Tollgate will be diverted to one half of the carriageway, about 20metres away from the active work zone, before being restored to full access after the construction area.

He added that rehabilitation would be carried out one lane at a time, stressing that once work on the first half is completed, traffic would be diverted to the rehabilitated section while work continues on the remaining half. Osiyemi assured motorists that Lagos-bound traffic would enjoy free flow throughout this phase.

According to the commissioner, Phase Two, covering Lagos-bound traffic from Obadeyi Bus Stop to Ekoro Junction, will take place from March 4 to March 11, 2026. He said vehicles heading towards Lagos and Abule-Egba from Abeokuta and Sango Tollgate would be diverted through one half of the road, with normal traffic flow restored after the construction zone.

Osiyemi added that, similar to Phase One, construction would be executed in halves, allowing traffic to be redirected to completed sections as work progresses, while Abeokuta-bound motorists would continue to enjoy uninterrupted movement.

While assuring road users that the state government would deploy adequate traffic management measures throughout the duration of the project to ensure safety and ease of movement,  Osiyemi urged them to plan their journeys ahead, obey traffic signs and cooperate with traffic officials on duty. 

The Commissioner also appealed for patience and understanding from the motoring public, noting that the repairs are essential and being carried out in the overall interest of all road users.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Abimbola Ogunaike

    Related Posts

    Orile-Agege PBAT/KOH CC, City Boy Movement Flags-off Campaign with Free Medical Outreach

    November 9, 2026

    Heritage Energy Relocates Over 100 Uzere residents As Multi-agency Investigation Continues

    November 9, 2026

    LIRS Reaffirms Commitment to Staff Welfare, Professional Development

    November 9, 2026

    Orile-Agege PBAT/KOH CC, City Boy Movement Flags-off Campaign with Free Medical Outreach

    November 9, 2026

    Heritage Energy Relocates Over 100 Uzere residents As Multi-agency Investigation Continues

    November 9, 2026

    LIRS Reaffirms Commitment to Staff Welfare, Professional Development

    November 9, 2026

    AFRIMA Founder Mike Dada Joins ACG Advisory Board

    November 9, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.