• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • Orile-Agege PBAT/KOH CC, City Boy Movement Flags-off Campaign with Free Medical Outreach
  • Heritage Energy Relocates Over 100 Uzere residents As Multi-agency Investigation Continues
  • LIRS Reaffirms Commitment to Staff Welfare, Professional Development
  • AFRIMA Founder Mike Dada Joins ACG Advisory Board
  • Eleganza Plans to Revive Manufacturing Operations at Alaba- Suru
  • NDLEA Arrests Ugandan Woman with Cocaine Concealed in Private Parts; Uncovers Multi-billion-Naira Drug Cartels
  • Nigeria Reaffirms Commitment to ECOWAS Migration, Border Security Cooperation 
  • Atiku: Fayose Moment has Arrived for CJN Kekere-Ekun
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » NRC Announces Date For Resumption Of Warri–Itakpe Train Service 
featured

NRC Announces Date For Resumption Of Warri–Itakpe Train Service 

NRC Announces Date For Resumption Of Warri–Itakpe Train Service , Nigerian Railway Corporation (NRC)
Abimbola OgunaikeBy Abimbola OgunaikeOctober 26, 2025Updated:October 26, 2025No Comments37 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Nigerian Railway Corporation (NRC)on Sunday, 26 October, 2025  announced the official resumption of the Warri–Itakpe Train Service.

The management of the Railway Corporation, which announced this through a statement made available to newsmen in Warri, Delta State, on Sunday, 26 October, 2025, said that the official resumption of the train service is scheduled for Wednesday, 29 October, 2025, after its temporary suspension.

The management disclosed in the statement that, “the temporary suspension was necessary to carry out critical repairs, maintenance, and system checks on the track and rolling stock to ensure the comfort, reliability and safety of passengers”.

The statement partly reads, “The online booking portal will open by 12 noon on Monday, October 27, 2025, about 48 hours ahead of resumption.

“Passengers are encouraged to secure their tickets early through the portal or at designated stations.

“Operations will commence with seven coaches, comprising six standard class and one business class.

“The train timetable, incorporating temporary speed restrictions (TSR) for safety and operational monitoring, will also be released on Monday”.

It noted that, “the corporation sincerely apologises to its esteemed passengers and stakeholders for the inconveniences experienced during the period of suspension and appreciates their patience and understanding.”

The Managing Director, Kayode Opeifa, assured the travelling public of the NRC’s renewed commitment to safe, reliable, and efficient rail services as passenger operations resume fully on the Warri–Itakpe.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Abimbola Ogunaike

    Related Posts

    Orile-Agege PBAT/KOH CC, City Boy Movement Flags-off Campaign with Free Medical Outreach

    November 9, 2026

    Heritage Energy Relocates Over 100 Uzere residents As Multi-agency Investigation Continues

    November 9, 2026

    LIRS Reaffirms Commitment to Staff Welfare, Professional Development

    November 9, 2026

    Orile-Agege PBAT/KOH CC, City Boy Movement Flags-off Campaign with Free Medical Outreach

    November 9, 2026

    Heritage Energy Relocates Over 100 Uzere residents As Multi-agency Investigation Continues

    November 9, 2026

    LIRS Reaffirms Commitment to Staff Welfare, Professional Development

    November 9, 2026

    AFRIMA Founder Mike Dada Joins ACG Advisory Board

    November 9, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.