• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • 2027: Yilwatda, Tasks APC Members to Win Lagos for Tinubu, Hamzat; Ojelabi Targets 5m Votes
  • Tinubu Releases N4bn for Payment of 600 ex-Nigeria Airways Workers
  • Rivers Assembly Reverses Sack of Three pro-Fubara Lawmakers After Three Years
  • We Shared Bunk Together in School, Femi Otedola Recalls Relationship with Hamzat
  • NDC Announces New Date to Inaugurate National Campaign Council
  • Arewa and 2027 Sucker Theory
  • Kwankwasiyya Spokesman Accuses  Atiku of Trying to De-market Peter Obi, Kwankwaso
  • KWAM 1 Seeks Hamzat’s Support for Daughter’s Lagos Assembly Ambition
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » NRC Completes Recovery of Coaches, Locomotives; Track Repair Nears Completion
Investigations

NRC Completes Recovery of Coaches, Locomotives; Track Repair Nears Completion

Soffiyyah OlamideBy Soffiyyah OlamideSeptember 22, 2025Updated:September 22, 2025No Comments32 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Nigerian Railway Corporation (NRC) has announced substantial progress in its recovery, repair, and safety efforts following the derailment of the Abuja–Kaduna train on August 26, 2025, at Asham.

The Corporation confirmed that its team of engineers has successfully re-railed and recovered all coaches and locomotives involved in the incident.

“These assets have since been moved to designated workshops for comprehensive assessment and further technical work.

“Our team of engineers has successfully repaired the main line to a level that allows us to safely resume operations. While train services will recommence, work on the secondary track will continue simultaneously.

“During this period, the second line will remain out of use until all necessary repairs are fully completed,” a statement by the Managing Director of NRC, Dr Kayode Opeifa said on Monday, 22 September, 2025.

According to him, the engineers have commenced a comprehensive safety and infrastructure assessment to ensure that all aspects of the corridor meet the highest standards of safety, durability, and reliability before operations resume.

“This phase includes a thorough evaluation of the repaired section and other critical infrastructure along the route,” he said.

NRC emphasized that the resumption of operations will only take place after all necessary technical inspections, tests, and certifications are concluded.

“Safety remains our top priority,” the Corporation stated, reaffirming its determination to restore public confidence in rail services.

“On passenger welfare, we confirm that out of the 618 passengers on board the affected train, 22 sustained injuries and are at various stages of recovery.

“We have successfully contacted 512 passengers, while 71 are yet to be reached due to various reasons ranging from not responding, wrong numbers, and unavailability.

“We have also completed an in-house investigation into the incident, with management accepting all recommendations of the internal investigation team.

“While awaiting the outcome of the committee set up by the Honourable Minister of Transportation, Senator Said Alkali, as well as the findings of the Nigerian Safety Investigation Bureau (NSIB), we wish to state clearly that our investigation points to human error — excessive speeding and misapplication of the emergency braking system.

“An official announcement on the resumption of train services on the corridor will be made very soon.

“While acknowledging the inconvenience caused, the NRC expressed deep appreciation to its passengers and the general public for their patience, support, and understanding throughout the recovery process.

“The Corporation also extended gratitude to media houses for their role in providing timely and accurate updates, as well as to the security agencies for their support in ensuring the safety of recovery operations and the protection of lives and property.

“To the security agencies, we are most appreciative of the role played during the emergency management as well as during the recovery period.

“We also acknowledge the support and understanding received from the office of the Honourable Minister of Transportation and the team at the FMOT.

“Finally, we are proud of the professionalism exhibited by our engineering and technical team, who have demonstrated extraordinary competence.

“Reaffirming our unwavering commitment, the NRC pledge to continue delivering safe, efficient, and dependable rail transport services, in line with Nigeria’s broader transportation modernization agenda,” Opeifa said.

Infrastructure Management Teams
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Soffiyyah Olamide

    Related Posts

    2027: Yilwatda, Tasks APC Members to Win Lagos for Tinubu, Hamzat; Ojelabi Targets 5m Votes

    October 20, 2026

    Tinubu Releases N4bn for Payment of 600 ex-Nigeria Airways Workers

    October 19, 2026

    We Shared Bunk Together in School, Femi Otedola Recalls Relationship with Hamzat

    October 19, 2026

    2027: Yilwatda, Tasks APC Members to Win Lagos for Tinubu, Hamzat; Ojelabi Targets 5m Votes

    October 20, 2026

    Tinubu Releases N4bn for Payment of 600 ex-Nigeria Airways Workers

    October 19, 2026

    Rivers Assembly Reverses Sack of Three pro-Fubara Lawmakers After Three Years

    October 19, 2026

    We Shared Bunk Together in School, Femi Otedola Recalls Relationship with Hamzat

    October 19, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.