• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • 2027: Hamzat Urges Support for Tinubu, APC Candidates in Meeting with Baales, Chiefs 
  • Pay With a Tap: Zenith Bank Customers  Can Now Use Google Pay In-store Online
  • Gombe at 30: Gov Convenes International Conference, Symposium to Celebrate 3 Decades of Progress
  • How Sen. Shehu Buba Is Sweeping APC in Bauchi State
  • Bauchi NUJ Exco Applauds ex-Chairman for Leadership Style; Leaving Money In Union’s Coffers
  • First Lady Attends Lausanne Nigeria Congress 2026, Says Gospel Must Shape, Influence Human Lives 
  • RHI Extends Food Relief to Persons with Disabilities to Ogun State
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Sanwo-Olu Conducts Test Run Of Red Line Train, Inspects Rail Facilities Ahead Commissioning; Takes 15min Ikeja-Iju Trip 
Business

Sanwo-Olu Conducts Test Run Of Red Line Train, Inspects Rail Facilities Ahead Commissioning; Takes 15min Ikeja-Iju Trip 

Olamide ObayemiBy Olamide ObayemiFebruary 24, 2024No Comments15 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Lagos State Governor Babajide Sanwo-Olu, Saturday, 24 February, 2024, took a test run of the Red Line train, inspecting the tracks and the rail corridors for another time ahead of next Thursday formal commissioning of Lagos Rail Mass Transit (LRMT) infrastructure.

The 37-kilometre rail line, built by the Lagos Metropolitan Area Transport Authority (LAMATA), will be inaugurated by President Bola Ahmed Tinubu, along with its stations and other ancillary facilities. The Red Line traverses seven stations from Agbado, a boundary town in Ogun State, to Oyingbo in Lagos Central.

Sanwo-Olu took journalists on a train ride from the Ikeja Mega Station of the Red Line in a last-minute effort to make the infrastructure ready for opening.

Joining the Governor on the ride was the Deputy Governor, Dr. Obafemi Hamzat, and members of the State cabinet.

The Red Line train, which left the garage track for the first time since it was delivered, departed from Ikeja Mega Station at exactly 2:23pm, moving steadily towards Agbado Station.

Six minutes later, the passengers arrived at Agege Station. The journey proceeded to Iju Station, arriving at 2:38pm — 15 minutes after leaving Ikeja.

While on board, Sanwo-Olu and his deputy moved along the coaches in a bid to ascertain the conditions the train’s cars — a set of Talgo wagons built in Milwaukee, Wisconsin in the United States.

Some of the comfort facilities inspected by the Governor included the train’s cooling system, handrails, cushioned seats and in-built safety features of the wagons.

After the inspection, Sanwo-Olu said the train line was ready for commissioning, but added that there would be continuous enforcement to clear the train path of unapproved activities.

He said: “We just completed another inspection of the Red Rail Line facility and corridor; now we are back in Ikeja Mega Station. We all have just used the train to Iju and back. I’m sure our media men can fully report what we all witnessed in the course of the short journey. This rail infrastructure is ready for inauguration, but we still have a few cleaning to do.

“The challenge we have is the pedestrian interference on the rail track and unapproved activities seen along the corridor. We will continue with the enforcement we started against illegal use of the rail corridor. We are in talks with NRC (Nigeria Railway Corporation) to reinforce the train route with physical barriers to limit pedestrian interference.”

The Governor urged the State’s residents to adhere to the rules of using the rail line, noting that infrastructure was not built for commercial activities.

The train operation, Sanwo-Olu said, would be regular and trips would be made in every 15 minutes. He said it was necessary to eliminate incidents that could result in fatality along the track.

“We have reduced human interference on the track considerably over the last two months, but enforcement continues. The stations are ready, the trains are ready and I believe Lagosians are ready to welcome this new infrastructure built for their use and benefit,” Sanwo-Olu said.

Ikeja -Iju Trip Rail Facilities Red Line Train Sanwo-Olu Test Run
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Olamide Obayemi

    Related Posts

    Pay With a Tap: Zenith Bank Customers  Can Now Use Google Pay In-store Online

    October 29, 2026

    Gombe at 30: Gov Convenes International Conference, Symposium to Celebrate 3 Decades of Progress

    October 29, 2026

    Bauchi NUJ Exco Applauds ex-Chairman for Leadership Style; Leaving Money In Union’s Coffers

    October 29, 2026

    2027: Hamzat Urges Support for Tinubu, APC Candidates in Meeting with Baales, Chiefs 

    October 29, 2026

    Pay With a Tap: Zenith Bank Customers  Can Now Use Google Pay In-store Online

    October 29, 2026

    Gombe at 30: Gov Convenes International Conference, Symposium to Celebrate 3 Decades of Progress

    October 29, 2026

    How Sen. Shehu Buba Is Sweeping APC in Bauchi State

    October 29, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.