• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • Nigeria’s Public Health Emergency: The Deadly Proliferation of Fake Foods and Drugs
  • Ogun Approves Key Road Projects, Advanced MRI Machine to Boost Connectivity, Healthcare
  • Tokunbo Pearce and President Bola Tinubu
  • Nigeria, India Sign Human Rights Agreement as Fagbemi Pledges Support for Implementation
  • 19 Nigerian Pension Funds Express Interest in Proposed $750m Infrastructure Fund
  • Diaspora Investment: NiDCOM, NDSI Move to Bridge Trust Deficit, Unlock Billions in Nigerian Capital
  • NSCDC Strengthens Gender Policy Implementation, Trains Officers on SGBV, Digital Safety
  • UK, Nigeria Deepen Creative Partnerships Ahead of 2028 Season of Culture
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Zulum Begins 7.1 km Express Road, Fourth Flyover in Borno
featured

Zulum Begins 7.1 km Express Road, Fourth Flyover in Borno

Abimbola OgunaikeBy Abimbola OgunaikeApril 22, 2025No Comments20 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Borno State Governor, Prof. Babagana Zulum has flagged off the construction of a 7.1 kilometres terminus junction to Molai express road with a 6-span bridge and the state’s fourth flyover along the busy Post Office area in Maiduguri on Tuesday, 22 April, 2025.

The projects, designed to address increasing vehicular traffic, aim to provide a seamless route for commuters and goods and significantly enhance access to key economic zones, schools and healthcare facilities.

With an estimated completion timeline of 8 and 10 months, the projects are expected to create hundreds of jobs for skilled and unskilled workers, further contributing to the state’s economic recovery and resilience efforts.

Speaking at the groundbreaking ceremony for the construction of a 7.1 kilometres terminus-Molai express road along Tashan Kano, Zulum said, “In continuation of our urban renewal programme, this morning we are here to flag off the construction of 7.1 km dual carriageway from Borno express terminal to Molai and also the construction of an additional bridge downstream of the road.”

He added, “What we are doing is not only for beautification but also to accommodate the increasing population growth in Maiduguri. We must expand the city.”

In the meantime, Zulum also charged the contractors for all the projects to ensure strict compliance with quality specifications and timely completion.

“Ten months is 10 months, the total contract sum is N16 billion and we have paid 50% of this amount. So, the contractor has no excuse for delaying the project. We have also kept aside the remaining 8bn to be paid when due,” Zulum said.

Also speaking, the state Commissioner for Works and Housing, Engr Mustapha Gubio, emphasised that the 6-span bridge is meant to link the new road along the two sides of the Ngada-Bul River.

The Commissioner also acknowledged that the ministry will adequately monitor the projects and ensure diligent compliance with the contract specifications.

Meanwhile, the Governor has announced five key projects, including a new market, an orthopaedic hospital, another General Hospital, an international hotel, and a western bypass.

The Governor, who announced the five projects and many other developmental services on Tuesday in Maiduguri, assured that they will be completed before the expiration of his tenure.

He said: “We want to construct a befitting additional market, an orthopaedic hospital, another General Hospital, an international hotel, and a western bypass. These are some of the major projects I want to execute before my tenure expires. Most importantly, completing all the ongoing projects.”

The Governor also expressed concern over the acute water shortage faced in Maiduguri Metropolis and surrounding communities which he said was caused by the destruction spurred by the flood disaster of last September (2024).

He however appealed to residents for calm while assuring them that the state government is committed to addressing the problem. He said, “Maiduguri water supply network was damaged by last year’s flood, and the city is faced with acute water shortage. We are working very hard to complete the repair work on time. 

He also stated that: “I want to appeal to the people of the metropolis. The government is very aware of the situation and we are doing everything possible to address it.”

Babagana Zulum Borno State Flyover
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Abimbola Ogunaike

    Related Posts

    Nigeria’s Public Health Emergency: The Deadly Proliferation of Fake Foods and Drugs

    November 11, 2026

    Ogun Approves Key Road Projects, Advanced MRI Machine to Boost Connectivity, Healthcare

    November 10, 2026

    Nigeria, India Sign Human Rights Agreement as Fagbemi Pledges Support for Implementation

    November 10, 2026

    Nigeria’s Public Health Emergency: The Deadly Proliferation of Fake Foods and Drugs

    November 11, 2026

    Ogun Approves Key Road Projects, Advanced MRI Machine to Boost Connectivity, Healthcare

    November 10, 2026

    Tokunbo Pearce and President Bola Tinubu

    November 10, 2026

    Nigeria, India Sign Human Rights Agreement as Fagbemi Pledges Support for Implementation

    November 10, 2026
    © 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

    Type above and press Enter to search. Press Esc to cancel.