• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • New Face of Ijebu-Ode: How Abiodun is Rewriting Story of Road Infrastructure
  • Junior D’Tigers, Junior D’Tigress Arrive Abidjan for FIBA U-18 AfroBasket 
  • Glasgow 2026: We’ll Build on Positives, Says Adeboye; Lauds NSC Leadership, Tinubu
  • NDDC Empowers Women to Build Wealth with Skills, Entrepreneurship
  • One More Look at Uba Sani’s Road to Kaduna’s Prosperity 
  • Tinubu to Review State Police Bill Sept 3
  • Only 36% of Nigerian Mothers Practice Exclusive Breast Feeding – FG
  • APC Commences LG Poll Campaign In Ebonyi
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Sanwo-Olu Fulfils Promise, Commences Re-construction of YabaTech Hostel Destroyed By Fire
Education

Sanwo-Olu Fulfils Promise, Commences Re-construction of YabaTech Hostel Destroyed By Fire

Khadijah OlowodeBy Khadijah OlowodeOctober 17, 2025Updated:October 17, 2025No Comments24 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Governor of Lagos State, Mr. Babajide Sanwo-Olu has commenced the rebuilding of the Yaba College of Technology’s burnt Bakassi Hostel with the Contractor taken over the project site of the hostel.

The Governor, while delivering the 36th Convocation Lecture of the college last year pledged to rebuild the burnt hostel, which has been abandoned for some years after the fire incidence.

The handover ceremony, held at the college’s main campus in Yaba, was led by Engr. Adedayo Adeyemi, Project Coordinator, Ministry of Works and Infrastructure, Lagos State, on behalf of the State Government.

The event signifies the state government’s commitment to fulfilling its pledge to rehabilitate a long-abandoned building within the institution.

Engr. Adeyemi, stated that the team was at the college to formally transfer the project site to the contractor for immediate commencement of work. He was accompanied by senior ministry officials, including directors of electrical, civil, and structural services.

He assured the college that all necessary documents and plans would be shared accordingly. He explained that initial design sketches were used to prepare cost estimates since the original structural drawings were not available at the time of contract award. However, he welcomed the college’s offer to provide updated plans to enhance technical compliance.

Speaking on behalf of the YabaTech management, Arc. Femi Lawal, Deputy Rector (Administration), who represented the Rector, expressed appreciation to the Lagos State Government for reviving a project that had been dormant for years. He described the day as significant in the college’s history, noting that the reconstruction will strengthen YABATECH’s capacity to train technically skilled students and expand its infrastructure base.

Arc. Lawal requested that the Ministry provide the college with copies of project drawings, schedules, and correspondence related to the work to ensure transparency and effective coordination. He nominated Director of Physical Planning, and Engr. Adewale Azeez, Director of Works and Services, as representatives of the college during site supervision and progress meetings.

He reaffirmed the college’s full cooperation with both the Ministry and the contractor, expressing optimism that the project would be completed within the stipulated nine months without delay.

“We are grateful to the Lagos State Government for keeping its promise, and we look forward to seeing this project through to completion,” he said.

Engr. Adeola Akinwale, who represented the contractor, expressed appreciation to both the Ministry and the college for their collaboration and pledged to deliver quality work within the timeline. “Our focus is to meet the project specifications and deliver on schedule,” the contractor’s representative stated.

The project, which is expected to be completed in nine months, forms part of the Lagos State Government’s drive to upgrade educational infrastructure across its tertiary institutions and strengthen technical education in the state.

The Rector, Yaba College of Technology, Dr Engr Ibraheem Abdul, at the handing over site eulogized the state governor for deeming it fit to rebuild the hostel and expressed the college gratitude to the governor through the team from the State Ministry of Works and Infrastructure. 

Government institution Project Representative
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Khadijah Olowode

Related Posts

NDDC Empowers Women to Build Wealth with Skills, Entrepreneurship

August 4, 2026

Tinubu to Review State Police Bill Sept 3

August 4, 2026

Don’t Weaponised State Police For Political Persecution, Lateef Fagbemi Warns Nigerians

August 4, 2026

New Face of Ijebu-Ode: How Abiodun is Rewriting Story of Road Infrastructure

August 4, 2026

Junior D’Tigers, Junior D’Tigress Arrive Abidjan for FIBA U-18 AfroBasket 

August 4, 2026

Glasgow 2026: We’ll Build on Positives, Says Adeboye; Lauds NSC Leadership, Tinubu

August 4, 2026

NDDC Empowers Women to Build Wealth with Skills, Entrepreneurship

August 4, 2026
© 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

Type above and press Enter to search. Press Esc to cancel.