• Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
Facebook X (Twitter) Instagram
Trending
  • How President Tinubu is Redrawing the South-east Political Map
  • Never Retreat Before a Bully
  • Imota LCDA Chairman Takes Sanitation Campaign to Ebute Ajebo PHC, Igbokuta Bridge 
  • Osun APC Spies Working Against Me, We’ll Meet In Court – Oluwole Oke 
  • Bamgbola is DG as PBAT/KOH Consolidated Renewed Hope Group is Launched in Lagos
  • First Daily Security Dialogue: Gov Diri, Political Actors, Defence Chiefs Confirm Attendance 
  • Troops Rescue Five, Intensify Search For Abducted Zamfara Council Chairman
  • Gunmen Abduct Zamfara LG Chairman, Wife, Children; kill Four Security Personnel
Facebook X (Twitter) Instagram
The Gazelle NewsThe Gazelle News
  • Home
  • News
  • Politics
  • Business
  • Entertainment
  • Education
  • Interviews
  • Sports
The Gazelle NewsThe Gazelle News
Home » Borno: Zulum Commissions Azare Mega Waterworks
Life

Borno: Zulum Commissions Azare Mega Waterworks

Olamide ObayemiBy Olamide ObayemiMarch 18, 2024No Comments24 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Borno State Governor, Prof. Babagana Zulum on Sunday, 17 March, 2024, commissioned Azare mega water works in Hawul Local Government Area in the southern part of Borno.

The project was aimed at addressing the lingering water scarcity in Azare town and the adjoining communities.

Azare Water Works is one of the eight mega water projects initiated by the Zulum administration across the state. While the water works in Ngarannam, Moramti, Pulka, Chibok and Azare have been completed those of Madinatu and Shokwari in Jere and Musari in Maiduguri are still ongoing.

The project has a combined 565,000-litre capacity reservoir, a 400,000ltrs corrugated surface tank raised on a reinforced concrete base and another 165,000ltrs corrugated overhead tank on a 12m height steel stanchion.

The facility is powered by 22,000kv solar power and equipped with 10Hp buster pumps. It has a 5km distribution reticulation network system and various types of batteries of taps along the distribution network.

The facility also comprises of clusters of over six basement solar-powered boreholes on depths ranging from 100m with a total discharge of more than 10 Iitres per second.

Performing the commissioning ceremony, Zulum said, “It is my singular honour and privilege to commission the Azare mega water works today, the 17th of March, 2024, to the glory of God and the benefit of humanity and this community.”

The state Commissioner of Water Resources, Engr Tijjani Goni Alkali, recalled that Zulum’s administration has constructed over ten basements and hybrid boreholes, 17 hand pump boreholes and rehabilitated 20 hand pumps in Hawul Local Government Area.

Engr Alkali explained that by completing the Azare mega water projects, the objective of providing potable water supply to the people of Hawul Local Government is being achieved and incidences of water-borne diseases will be curtailed.

Azare Mega waterworks Borno State Commissioned Zulum
Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Olamide Obayemi

Related Posts

How President Tinubu is Redrawing the South-east Political Map

July 26, 2026

Imota LCDA Chairman Takes Sanitation Campaign to Ebute Ajebo PHC, Igbokuta Bridge 

July 26, 2026

Osun APC Spies Working Against Me, We’ll Meet In Court – Oluwole Oke 

July 26, 2026

How President Tinubu is Redrawing the South-east Political Map

July 26, 2026

Never Retreat Before a Bully

July 26, 2026

Imota LCDA Chairman Takes Sanitation Campaign to Ebute Ajebo PHC, Igbokuta Bridge 

July 26, 2026

Osun APC Spies Working Against Me, We’ll Meet In Court – Oluwole Oke 

July 26, 2026
© 2026 All Rights Reserved. The Gazelle News. Designed By DeedsTech.

Type above and press Enter to search. Press Esc to cancel.